TechnipFMC has been awarded a significant integrated Engineering, Procurement, Construction, and Installation (iEPCI™) contract by Wintershall Dea Norge AS for its Maria revitalisation project.

The project will boost production at the existing Maria field in the Norwegian Continental Shelf. The contract includes subsea trees, spools, jumpers, and flexible pipes.

The revitalisation project will tie in an additional lightweight six-slot integrated template structures (ITS). The two existing templates in the Maria field are part of TechnipFMC’s installed base and began production in 2017.

Jonathan Landes, President, Subsea at TechnipFMC, commented: “This iEPCI™ award is built on our ability to leverage our integrated front end engineering and design (iFEED™) model. Through early engagement, we optimized the field layout and maximised the benefits of integrated project execution. Our involvement helped reduce the carbon footprint of the revitalisation project by modifying existing infrastructure, eliminating the need for an additional 4,000 meters of pipe.”

Source: https://www.technipfmc.com/
Image source: Courtesy of TechnipFMC

Read more Subsea news here